This Curb Side xeriscaping project included removing over 12,000 sq ft of sod that was replaced by a drought tolerant landscaping. It included dry river beds, boulder outcroppings, alpine niche plant groupings, and a small decorative fountain spillway bowls.
Check out the images below and the youtube post to see this entire project unfold.











